کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1751359 1018412 2011 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Development of hydropower energy in Turkey: The case of Çoruh river basin
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی های تجدید پذیر، توسعه پایدار و محیط زیست
پیش نمایش صفحه اول مقاله
Development of hydropower energy in Turkey: The case of Çoruh river basin
چکیده انگلیسی

The main objective in doing the present study is to investigate the sustainable development of hydropower plants in the Çoruh river basin of Turkey, which is least problem river of Turkey in respect to international cooperation as compared with Turkey's other trans-boundary waters. Initial studies concerning the hydropower production potential in Çoruh basin had been carried out by Turkish authorities in the late 1960s. Total installed power capacity and annual average energy generation of 37 dams and run of river (without storage) hydropower plants developed at various project stages by The Electrical Power Resources Survey and Development Administration (EİE) in Çoruh basin are 3132.70 MW and 10.55 TWh/yr, respectively. Today, this generation value corresponds 6.45% of Turkey's energy consumption in 2006 while it meets 6.3% of total electricity energy production of Turkey which is equal to 167.9 TWh/yr in 2006. Besides, this potential developed at various project stages in Çoruh basin will provide 24.1% of Turkey's hydroelectric energy generation being equal to 43.8 TWh/yr in 2006.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Renewable and Sustainable Energy Reviews - Volume 15, Issue 2, February 2011, Pages 1201–1209
نویسندگان
, , ,