Design and construction of drift tube linac cavities for RIKEN RI Beam Factory
موضوعات مرتبط
مهندسی و علوم پایه فیزیک و نجوم ابزار دقیق
پیش نمایش صفحه اول مقاله
Design and construction of drift tube linac cavities for RIKEN RI Beam Factory
چکیده انگلیسی

A new injector linac “RILAC2”, has recently been constructed at the RIKEN RI Beam Factory. The main part of the RILAC2 is a drift tube linac that consists of three newly designed cavities. These cavities operate in continuous wave (CW) mode at a fixed frequency of 36.5 MHz. Their structure is based on a quarter-wavelength resonator because this is the smallest resonator available in this frequency range among the available structures. We adopted the direct coupling method in the construction of these cavities. A power amplifier was directly coupled to the cavity without a long transmission line to reduce the installation area and simultaneously reduce construction cost. A detailed cavity and coupler design was carried out via simulation. Our work also describes the design process using three-dimensional electromagnetic simulation software. Construction and operation tests are also shown.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment - Volume 722, 11 September 2013, Pages 55–64