کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1827870 1526478 2009 4 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
CMS Tracker upgrade issues and plans
موضوعات مرتبط
مهندسی و علوم پایه فیزیک و نجوم ابزار دقیق
پیش نمایش صفحه اول مقاله
CMS Tracker upgrade issues and plans
چکیده انگلیسی

The LHC accelerator complex will undergo a programme of consolidation and upgrade of various components, with the goal of exceeding a peak luminosity of 1034cm-2s-1 (original design figure) around the year 2012; to eventually reach values close to 1035cm-2s-1. The increase in luminosity poses new challenges to the detector operation, both in terms of instantaneous and integrated particle rates. In CMS, the systems that have been identified as requiring substantial upgrades are the Tracker and the Level 1 trigger. The tracking system needs higher readout granularity and higher radiation tolerance, at the same time with reduced power dissipation and a smaller material budget, which are already limiting the performance of the present detector. The trigger system needs to include tracking information at Level 1, to maintain an acceptable rate without losing efficiency for physics channels. These requirements further complicate the design of a new Tracker detector and its readout architecture. This report describes the current status of our CMS Tracker upgrade activities.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment - Volume 604, Issues 1–2, 1 June 2009, Pages 273–276
نویسندگان
,