کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1827871 | 1526478 | 2009 | 4 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Status of the CMS Silicon Strip Tracker and commissioning results
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
موضوعات مرتبط
مهندسی و علوم پایه
فیزیک و نجوم
ابزار دقیق
پیش نمایش صفحه اول مقاله
چکیده انگلیسی
The main subsystems of the CMS Silicon Strip Tracker were assembled together in a dedicated large clean room at CERN prior to their installation in the CMS collision hall. Following the integration of the Tracker a long commissioning period took place, during which up to 15% of the silicon modules were operated and read out simultaneously at different temperatures. Some of the achievements of the commissioning phase are discussed in details like Tracker noise performance, signal-to-noise measurements, and hit reconstruction efficiency. The Tracker was inserted in CMS in December 2007 and the commissioning of the full Tracker started. A description of the commissioning procedure followed at CMS and the actual status of the Tracker are presented.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment - Volume 604, Issues 1â2, 1 June 2009, Pages 277-280
Journal: Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment - Volume 604, Issues 1â2, 1 June 2009, Pages 277-280
نویسندگان
Ioana Anghel,