Industrial test and techno-economic analysis of CO2 capture in Huaneng Beijing coal-fired power station
چکیده انگلیسی

The first industrial-scale CO2 capture plant in China has been demonstrated at Huaneng Beijing power plant has shown that this technology is a good option for the capture of CO2 produced by commercial coal-fired power plants. The commissioning and industrial tests are introduced in this paper. The tests show that in the early stages of the passivation phase, the concentration variations of amine, anti-oxidant and Fe3+ are in the normal range, and the main parameters achieve the design value. The efficiency of the CO2 capture was about 80–85%, and by the end of January 2009 about 900 tons of CO2 (99.7%) have been captured. The equipment investment and consumptive costs, including steam, power, solution and others, have been analyzed. The results show: the cost of the absorber and the stripper account for about 50% of main equipment; the consumptive cost is about 25.3 US$ per metric tons of CO2, of which the steam requirement accounts for about 55%; the COE increased by 0.02 US$/kW h and the electricity purchase price increased by 29%.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Applied Energy - Volume 87, Issue 11, November 2010, Pages 3347–3354
نویسندگان
, , , , , , , ,