کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
246363 502364 2015 16 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Bilevel and multi-objective dynamic construction site layout and security planning
ترجمه فارسی عنوان
طرح بندی سایت و ساختار چندمنظوره ساخت و ساز و برنامه ریزی امنیتی
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
چکیده انگلیسی


• A new model for the joint dynamic construction site layout and security decisions is proposed.
• Multiple objectives, bilevel decision makers, and twofold randomness are incorporated.
• A Particle Swarm Optimization Algorithm is developed to handle infeasible solutions effectively.
• A practical case is given to demonstrate the proposed model and algorithms.

The joint problem of dynamic construction site layout and security planning is fundamental to any construction project. However, it is still largely unexplored. Few research studies investigated the implementation of security measures during the construction phase. This paper proposes a bilevel multi-objective model for the dynamic construction site layout and security planning problem. Specifically, the upper-level programming denotes that the project manager must first choose the construction site layout and security strategies to minimize the layout costs and consequences of a potential attack. The lower-level programming denotes that the attacker will destroy a subset of the facilities to inflict the maximum economic consequence on the construction facilities system. Thereafter, a bilevel multi-objective Particle Swarm Optimization Algorithm (MOBLPSO) is designed to solve this model. Finally, the approach is carried out in the Xiajiang hydropower large-scale construction project to illustrate the effectiveness of the proposed model and algorithm.

Figure optionsDownload as PowerPoint slide

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Automation in Construction - Volume 57, September 2015, Pages 1–16
نویسندگان
, , , ,