کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
247285 502415 2009 14 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A two-phase GA model for resource-constrained project scheduling
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
A two-phase GA model for resource-constrained project scheduling
چکیده انگلیسی

In construction scheduling, problems can arise when each activity could start at different time points and the resources needed by the activities are limited. Moreover, activities have required conditions to be met, such as precedence relationships, resource requirements, etc. To resolve these problems, a two-phase GA (genetic algorithm) model is proposed in this paper, in which both the effects of time-cost trade-off and resource scheduling are taken into account. A GA-based time-cost trade-off analysis is adopted to select the execution mode of each activity through the balance of time and cost, followed by utilization of a GA-based resource scheduling method to generate a feasible schedule which may satisfy all the project constraints. Finally, the model is demonstrated using an example project and a real project.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Automation in Construction - Volume 18, Issue 4, July 2009, Pages 485–498
نویسندگان
, ,