کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
247323 502418 2008 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Evolutionary resource scheduler for linear projects
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Evolutionary resource scheduler for linear projects
چکیده انگلیسی

Linear projects, such as, highways, tunnels, and pipelines, represent a class of construction projects typically characterized by their repetitive, but rather few, activities. As common in any construction project, the proper management of construction resources plays a vital role in its successful execution. This is by no means different for the case of linear projects. In recognition of this fact, the paper presents a genetic algorithm-based system for performing the necessary task of resource scheduling in linear projects under the linear scheduling method (LSM) scheme. Resource scheduling, particularly through the resource leveling process, is performed via minimizing either the day-to-day fluctuations in resource usage or the daily deviations from the average resource usage. This process further encompasses optimizing the rate of progress and buffer for each project activity. Implementation of the study was conducted using AutoLISP programming under AutoCAD™. For verifying the results, a comparison with another contemporary study in resource scheduling/leveling for linear projects is carried out. An actual highway construction project is used for the comparison, where the presented approach shows broadly satisfying results.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Automation in Construction - Volume 17, Issue 5, July 2008, Pages 573–583
نویسندگان
,