کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
247380 502422 2009 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Construction rescheduling based on a manufacturing rescheduling framework
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Construction rescheduling based on a manufacturing rescheduling framework
چکیده انگلیسی

Changes during project execution frequently require schedule updating and rescheduling. However, few studies have discussed rescheduling issues or implemented rescheduling solutions for construction projects. This study investigates resource-constrained construction rescheduling issues using concepts associated with manufacturing rescheduling. Based on an initial schedule and actual progress, a novel rescheduling optimization model using Constraint Programming (CP) techniques is developed to reschedule projects. Two rescheduling methods: (1) complete regeneration (CR); and, (2) partial rescheduling (PR) while minimizing overall project variation are implemented in the proposed model to demonstrate the model capability and applications. PR requiring additional treatments to decrease overall project variation is performed using a novel constraint-release mechanism. Finally, using a case study, optimization results obtained using two rescheduling methods are analyzed and discussed.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Automation in Construction - Volume 18, Issue 6, October 2009, Pages 715–723
نویسندگان
, ,