کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
275502 1429667 2016 15 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
An ex ante bidding model to assess the incentive creation capability of a public–private partnership pipeline
ترجمه فارسی عنوان
مدلی در حول و حوش مناقصه سابق برای ارزیابی قابلیت ایجاد انگیزه یک خط مشارکتی دولتی- خصوصی
کلمات کلیدی
تهیه قرارداد و مناقصه؛ مناقصه چند پروژه؛ شبیه سازی
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
چکیده انگلیسی


• A game-theoretic bidding model for the PPP tendering procedure is developed.
• The impact of a government's project agenda on the bidding is assessed.
• Contractor's requested mark-ups decrease in the number of projects.
• Incentive creation tools help to make entrants invest in higher quality proposals.

The inherent risky nature of public–private partnerships requires contractors to develop expensive project proposals, which is seen as a burden to enter the playing field. It is believed that a pipeline of projects could succeed in triggering contractors' enthusiasm and increasing competition. This paper theoretically assesses whether the pipeline serves as an effective tool to levy this barrier to entry. A theoretical model and a simulation experiment that mimics the tendering process with heterogeneity in the bidders' cost structure are presented. In particular, the impact on the ex ante bid preparation effort willingness and the mark-ups is assessed by heuristically approximating the Bayesian Nash equilibrium. A statistical scenario analysis approves that mark-ups are lower when more projects are included in the pipeline, leading to fiercer price competition and a lower government procurement cost. Nonetheless, the incentive creation with respect to investment efforts is limited according to the experiment.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Project Management - Volume 34, Issue 1, January 2016, Pages 117–131
نویسندگان
, ,