کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
275923 | 1429685 | 2013 | 13 صفحه PDF | دانلود رایگان |
A contingency estimation model for software development projects is presented. The proposed model considers the estimated cost and the risk of software projects to estimate contingency resources; hence, contingency estimates are correlated to the cost and risk of software projects. The model uses a generic probabilistic representation of the estimated cost; hence, it can be deployed with any project development environment and provides a flexible choice to software managers. Furthermore, the proposed model considers the risk tolerance of software organizations to estimate the contingency and helps to abate the maximum impacts of risk events within the risk tolerance. The proposed model is scalable to a portfolio of software projects. The model produces sub-additive contingency estimates which is essential to optimize a software project or a portfolio of software projects. The results of a case-study show that the contingency estimates are comparable with the actual contingency resources needed for the development of real software development projects.
► The proposed model estimate the contingency resources based on the measure of risk.
► The model is generic and does not depend on any specific representation of cost.
► The model is scalable to portfolios of software projects.
► The model produces sub-additive estimates of contingency resources.
Journal: International Journal of Project Management - Volume 31, Issue 7, October 2013, Pages 981–993