کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
276228 1429701 2011 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Study on safety control for Wuhan metro construction in complex environments
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Study on safety control for Wuhan metro construction in complex environments
چکیده انگلیسی

Open cut method is adopted in the foundation pit construction of Wuhan Metro Line 2 (WML2) XunLiMen Station which is under the bridge of the (existent) operating light rail. The foundation pit is only 1.25 m away from the nearest pier of Wuhan Light Rail Line 1 (WLRL1).Safety control of this project focuses on how foundation pit construction affects the safety of light rail bridge and its operation. In this paper, finite difference software FLAC3D for geotechnical engineering is applied to simulating the process of the foundation pit excavation and to analyze the impact of the isolation pile construction, the underground diaphragm wall construction and the foundation pit dewatering and excavation on the bridge piers of WLRL1, while the finite element software ANSYS is used to simulate the numerical model of WLRL1. Moreover, the study of the impact of the construction scheme of WML 2 on the operation of WLRL1 is also presented in the paper. Finally, on the basis of the simulation results, (the) control standards for the operation safety of WLRL1 and (the) advices for the safety control of the foundation pit construction, which proved to be successful, are proposed.

Research highlights
► We model the Xunlimen Station project using FLAC3D.
► We adopt the 3D numerical simulation analysis of light rail bridge.
► We propose the control standard of light rail bridge security operations.
► The construction safety schemes are suggested.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Project Management - Volume 29, Issue 7, October 2011, Pages 797–807
نویسندگان
, , , , ,