کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
276234 1429701 2011 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A total environmental risk assessment model for international hub airports
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
A total environmental risk assessment model for international hub airports
چکیده انگلیسی

This paper presents a multi-criteria decision analysis for environmental risk assessment (ERA) with regard to avoiding and eliminating damages and loss under natural disasters in international airport projects. It starts from an assumption that the strategy of eliminating damages and losses under natural disasters is related to the location selection problem, and it is necessary to use the multi-criteria decision analysis for calculated decision-making support. The paper uses the analytic network process (ANP) to demonstrate one of its utility modes in decision-making support to location selection problems, which aims at an evaluation of different projects from different locations. A set of generic criteria for risk assessment at international projects was put forward to support ANP modelling, and it was due to the consideration of social, technical, economic, environmental and political (STEEP) criteria related to the built, social and natural (BSN) trinity environment of international airport projects. At the end, an experimental case study on three international hub airports in China is given to test the ANP model called ERA.Airport, and it is concluded that ANP can be effectively used for risk assessment in the specific utility mode. The ERA.Airport is a generic multi-criteria decision-making model and can be used across the world for accurate environmental risk assessment for international airports.

Research highlights
► New concept of total environmental risk assessment (ERA).
► ANP model for risk assessment at mega construction projects.
► Novel approach to data collection in multicriteria decision making.
► Unique tool for risks assessment at international aitport projects.
► Original case study on three hub airports in China.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Project Management - Volume 29, Issue 7, October 2011, Pages 856–866
نویسندگان
, , , , ,