کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
276235 1429701 2011 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Comparing the value of information sharing under different inventory policies in construction supply chain
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Comparing the value of information sharing under different inventory policies in construction supply chain
چکیده انگلیسی

Measuring the value of information sharing (VIS) in different inventory policies can help general contractor to improve materials and equipments management in construction supply chain. The models for measuring the VIS under (s, S) and Periodic Review (PR) inventory policies are established. A method to compare the VIS is given in a two-level construction supply chain, which aims to measure the impacts of supply quantity information of materials on general contractor's service level and total inventory cost under different inventory policies. A numerical example is proposed to explore the gap of VIS between (s, S) and PR inventory policies in a rebar supply chain. The results show that general contractor's service level in (s, S) inventory is higher than PR's and total inventory cost in (s, S) inventory is lower than PR's in the case of no information sharing. In the case of information sharing, general contractor's service level in PR inventory policy is higher than (s, S) policy; however, it is implemented by the increase of total inventory cost. This research provides valuable information to help general contractor to make correct decision on inventory management in supply chain at firm-level.

Research highlights
► A method to compare the value of information is given in a two-level construction supply chain.
► The models to measure the impacts of supply quantity information on general contractor (GC)'s service level and total inventory cost (TIC) are established.
► GC's service level in (s, S) inventory is higher and TIC is lower than Periodic Review (PR)'s in the case of no information sharing.
► GC's service level in PR inventory is higher than (s, S)'s in the case of information sharing.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Project Management - Volume 29, Issue 7, October 2011, Pages 867–876
نویسندگان
, , , , ,