کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
292695 511036 2015 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Application study on the first cable-stayed bridge with CFRP cables in China
ترجمه فارسی عنوان
مطالعه کاربردی در اولین پل کابلی با کابل های CFRP در چین
کلمات کلیدی
پل کابلی؛ روش اجزای محدود؛ کابل CFRP؛ لنگرگاه نوع باند
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی هوافضا
چکیده انگلیسی

In order to push forward the development of CFRP cable-stayed bridge and accumulate experiences, the study on the application of the first cable-stayed bridge with CFRP cables in China was carried out. The design essentials of main components of the bridge were introduced and its integral performances, including static properties, dynamic properties and seismic response were analyzed using finite element method. A new bond-type anchorage was developed and the processes of fabricating and installing CFRP cables were elaborated. Based on the results of construction simulation, a tension scheme for bridge was propound. During constructing, the stresses and displacement of girder and pylon, as well as the forces and stresses of cables, were tested. The results indicate that all sections of the bridge could meet the requirements of the ultimate bearing capacity and normal service; the performance of the anchorage is good and the stresses in each cable system are similar; the tested values accord well with the calculated values. Further, creep deformation of the resin in anchorages under service load is not obvious. All these results demonstrate that the first application of CFRP cables in the cable-stayed bridge in China is successful.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Traffic and Transportation Engineering (English Edition) - Volume 2, Issue 4, August 2015, Pages 242–248
نویسندگان
, , ,