Implementation for maintaining the building-top GPV system
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی های تجدید پذیر، توسعه پایدار و محیط زیست
پیش نمایش صفحه اول مقاله
Implementation for maintaining the building-top GPV system
چکیده انگلیسی

This paper is to present the implementation for maintenance of the 5 kW a-Si GPV systems that were installed on the building-top of the Electrical Engineering Department at RMUTSB Nonthaburi, Thailand. The author had studied the way to maintain this system after operating for three years (2004–2006).The maintenance methods are classified into three parts. They are electrical, mechanical and component maintenance. Then the author used the maintenance check list for building-top GPV that author had developed. The period for planned maintenance was on July 2004, July 2005 and July 2006.The results are as follows:1.The time for GPV shutdown system is 232 h or 0.88% of system operating time.2.The maintenance quantities are 17 times. They are 13 times for electrical maintenance and four times for component maintenance.3.The time required for maintenance is 50 h. Thirty-six hours for electrical maintenance and 14 h for component maintenance.4.The maintenance time (percent) used for the first year was 8%, second year was 20% and the last year was 72%.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Renewable Energy - Volume 34, Issue 2, February 2009, Pages 444–449
نویسندگان
,