کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
311519 533970 2009 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Tunnel design considering stress release effect
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Tunnel design considering stress release effect
چکیده انگلیسی

In tunnel design, the determination of installation time and the stiffness of supporting structures is very important to the tunnel stability. This study used the convergence-confinement method to determine the stress and displacement of the tunnel while considering the counter-pressure curve of the ground base, the stress release effect, and the interaction between the tunnel lining and the rock surrounding the tunnel chamber. The results allowed for the determination of the installation time, distribution and strength of supporting structures. This method was applied to the intake tunnel in the Ban Ve Hydroelectric Power Plant, in Nghe An Province, Vietnam. The results show that when a suitable displacement µ0 ranging from 0.0865 m to 0.0919 m occurrs, we can install supporting structures that satisfy the stability and economical requirements.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Water Science and Engineering - Volume 2, Issue 3, September 2009, Pages 87-95