کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
385881 | 660873 | 2011 | 12 صفحه PDF | دانلود رایگان |

In this paper, we focus on the vendor selection problem (VSP) for material supply in large-scale water conservancy and hydropower construction projects, and establish a corresponding model to solve this problem. After stating the problem, we introduce some basic knowledge of level-2 fuzzy sets and the way to transform them to normal fuzzy sets. Then we use the CCP model to handle the bifuzzy objective functions and constraints, based on a series of preparations, we transform the multi-objective integer model under bifuzzy environment into a deterministic model, then use particle swarm optimization (PSO) to solve this problem. The model is illustrated with an actual application to construction material supply.
Research highlights
► We model the vendor selection problem in a bifuzzy environment.
► We use chance-constrained programming to get the crisp model.
► PSO is used to solve this problem.
► The application shows that the proposed model is effective.
► Analysis shows that the parameters’ values may affect the results.
Journal: Expert Systems with Applications - Volume 38, Issue 8, August 2011, Pages 9684–9695