کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
386221 660880 2010 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Simulation and scheduling implementation study of TFT-LCD Cell plants using Drum–Buffer–Rope system
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر هوش مصنوعی
پیش نمایش صفحه اول مقاله
Simulation and scheduling implementation study of TFT-LCD Cell plants using Drum–Buffer–Rope system
چکیده انگلیسی

The thin film transistor liquid crystal display (TFT-LCD) manufacturing process consists of three basic process stages: array process, Cell process and Module process. Little previous research works are found on the problem of scheduling and control TFT-LCD Cell plant due to its specific domain. In this article, we are concerned with the scheduling and control of Cell plants by using Drum–Buffer–Rope (DBR) System based on theory of constraints (TOC). Although the DBR system have been successfully implemented in some manufacturing plants, the detailed design rule or applications must be customized based on the special characteristics and requirement of different manufacturing environments. A DBR customized model for TFT-LCD Cell process is proposed in this article due to its specific domain. A detailed exploration of the required customization of Drum design algorithm in this method is presented. A real-life Cell plant case is utilized to explain the significance and feasibility of the proposed method.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Expert Systems with Applications - Volume 37, Issue 12, December 2010, Pages 8127–8133
نویسندگان
, , , ,