On the inter-area optimal voltage and reactive power control
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر هوش مصنوعی
پیش نمایش صفحه اول مقاله
On the inter-area optimal voltage and reactive power control
چکیده انگلیسی


• The distributed slack bus model improves the optimization results.
• Limit on inter-area reactive power flow improves the solution of optimizations.
• Collaboration is required since approaches are not robust to strategic behaviors.
• Limit on inter-area reactive power flow is effective against strategic behaviors.

Scheduling voltage and reactive power is one of the major problems and concerns of the Transmission System Operators (TSOs) especially after deregulation of power market. Due to locally provision of the reactive power resources, each TSO has developed its own specific method. Hence, the voltage and reactive power coordination in the interconnected system has got less attention. In this respect, current practices of different TSOs in Europe and North America, as examples of interconnected power systems, are investigated in this paper. Afterwards, it focuses on the inter-area optimization of the voltage and reactive power. Instead of performing the studies around one particular optimization, different aspects of the mathematical formulation of the optimization problem in the interconnected power system, including objective function, constraints and appropriate modeling of neighboring areas, are revisited more in depth. Various possible implementations of coordinated approaches, including centralized and decentralized structures, as well as non-coordinated approach in collaborative and non-collaborative environments are studied. In this respect, new contributions are proposed in this paper by using the distributed slack bus model and the limitation of the voltage and reactive power in the interconnections links. The comparative analysis between the available and proposed methods are discussed in terms of sub-optimality and time to convergence. The discussions are based on New England 39 bus system and the presented results in the literatures.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Electrical Power & Energy Systems - Volume 52, November 2013, Pages 1–13
نویسندگان
, ,