کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
399754 1438758 2012 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Unit commitment problem in deregulated environment
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر هوش مصنوعی
پیش نمایش صفحه اول مقاله
Unit commitment problem in deregulated environment
چکیده انگلیسی

This paper addresses the self-scheduling problem of generation companies owning thermal power units considering bilateral contracts and day-ahead market. This approach allows precise modelling of variable costs, start-up costs and comprehensive system of constraints. The self-scheduling model is formulated as deterministic optimization problem in which expected profit is maximized by 0/1 mixed-integer linear programming technique. Solution is achieved using the homogeneous and self-dual interior point method for linear programming, with a branch and bound optimizer for integer programming. The effectiveness of the proposed model for optimizing the thermal generation schedule is demonstrated through the case study with detailed discussion.


► Paper presents MILP model for unit commitment problem on day-ahead market.
► Model requires a single type of binary variables used in modelling on/off decision.
► Bilateral contracts are included in this model to reduce risk of profit deviation.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Electrical Power & Energy Systems - Volume 42, Issue 1, November 2012, Pages 150–157
نویسندگان
, , ,