کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
400048 1438779 2010 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Scheduling of head-dependent cascaded reservoirs considering discharge ramping constraints and start/stop of units
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر هوش مصنوعی
پیش نمایش صفحه اول مقاله
Scheduling of head-dependent cascaded reservoirs considering discharge ramping constraints and start/stop of units
چکیده انگلیسی

This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning head-dependent reservoirs under competitive environment. We propose a novel method, based on mixed-integer nonlinear programming (MINLP), for optimising power generation efficiency. This method considers hydroelectric power generation as a nonlinear function of water discharge and of the head. The main contribution of this paper is that discharge ramping constraints and start/stop of units are also considered, in order to obtain more realistic and feasible results. The proposed method has been applied successfully to solve two case studies based on Portuguese cascaded hydro systems, providing a higher profit at an acceptable computation time in comparison with classical optimisation methods based on mixed-integer linear programming (MILP).

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Electrical Power & Energy Systems - Volume 32, Issue 8, October 2010, Pages 904–910
نویسندگان
, , ,