کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4630745 1340606 2011 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Using genetic algorithms for the coordinated scheduling problem of a batching machine and two-stage transportation
موضوعات مرتبط
مهندسی و علوم پایه ریاضیات ریاضیات کاربردی
پیش نمایش صفحه اول مقاله
Using genetic algorithms for the coordinated scheduling problem of a batching machine and two-stage transportation
چکیده انگلیسی

This paper considers a coordinated scheduling problem. For the first-stage transportation there is a crane available to transport the product from the warehouse to a batching machine. For the second-stage transportation there is a vehicle available to deliver the completed jobs from the machine shop floor to the customer. The coordinated scheduling problem of production and transportation deals with sequencing the transportation of the jobs and combining them into batches to be processed. The problem of minimizing the sum of the makespan and the total setup cost was proven by Tang and Gong [1] to be strongly NP-hard. This paper proposes two genetic algorithm (GA) approaches for this scheduling problem, with different result representations. The experimental results demonstrate that a regular GA and a modified GA (MGA) can find near-optimal solutions within an acceptable amount of computational time. Among the two proposed metaheuristic approaches, the MGA is superior to the GA both in terms of computing time and the quality of the solution.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Applied Mathematics and Computation - Volume 217, Issue 24, 15 August 2011, Pages 10095–10104
نویسندگان
,