کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | ترجمه فارسی | نسخه تمام متن |
---|---|---|---|---|---|
475785 | 699375 | 2013 | 15 صفحه PDF | سفارش دهید | دانلود رایگان |

Mathematical formulations for production planning are increasing complexity, in order to improve their realism. In short-term planning, the desirable level of detail is particularly high. Exact solvers fail to generate good quality solutions for those complex models on medium- and large-sized instances within feasible time. Motivated by a real-world case study in the pulp and paper industry, this paper provides an efficient solution method to tackle the short-term production planning and scheduling in an integrated mill. Decisions on the paper machine setup pattern and on the production rate of the pulp digester (which is constrained to a maximum variation) complicate the problem. The approach is built on top of a mixed integer programming (MIP) formulation derived from the multi-stage general lotsizing and scheduling problem. It combines a Variable Neighbourhood Search procedure which manages the setup-related variables, a specific heuristic to determine the digester's production speeds and an exact method to optimize the production and flow movement decisions. Different strategies are explored to speed-up the solution procedure and alternative variants of the algorithm are tested on instances based on real data from the case study. The algorithm is benchmarked against exact procedures.
Journal: Computers & Operations Research - Volume 40, Issue 7, July 2013, Pages 1804–1818