کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
476975 | 1446094 | 2011 | 7 صفحه PDF | دانلود رایگان |

We consider the simultaneous design and operation of remnant inventory supply chains. Remnant inventory is generated when demand for various lengths of a product may be satisfied by existing inventory, or by cutting a large piece into smaller pieces. We formulate our problem as a two-stage stochastic mixed-integer program. In solving our stochastic program, we enhance the standard L-shaped method in two ways. Our computational experiments demonstrate that these enhancements are effective, dramatically reducing the solution time for large instances.
► We consider the simultaneous design and operation of a remnant inventory supply chain.
► The problem is formulated as a two-stage stochastic program.
► Enhancements to the L-shaped method are developed.
► Computational results are provided.
Journal: European Journal of Operational Research - Volume 214, Issue 2, 16 October 2011, Pages 358–364