کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
480561 | 1446080 | 2012 | 14 صفحه PDF | دانلود رایگان |

In this paper we present an application of project scheduling concepts and solution procedures for the solution of a complex problem that comes up in the daily management of many company Service Centres. The real problem has been modelled as a multi-mode resource-constrained project scheduling problem with pre-emption, time and work generalised precedence relationships with minimal and maximal time lags between the tasks and due dates. We present a complete study of work GPRs which includes proper definitions, a new notation and all possible conversions amongst them. Computational results that show the efficiency of the proposed hybrid genetic algorithm and the advantages of allowing pre-emption are also presented.
► We model a task scheduling and human resource management problem in Service Centres.
► The model is a pre-emptive multi-mode resource-constrained project scheduling problem with GPRs and due dates.
► A study of the different types of work GPRs with minimal and maximal work lags is presented.
► The efficiency of the proposed GA and the advantages of pre-emption are shown.
Journal: European Journal of Operational Research - Volume 219, Issue 1, 16 May 2012, Pages 59–72