کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
482723 1446146 2009 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A minmax regret approach to the critical path method with task interval times
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
A minmax regret approach to the critical path method with task interval times
چکیده انگلیسی

The execution of a given project, with a number of interrelated tasks due to precedence constraints, represents a challenge when one must to control the available resources and the compromised due dates. In this paper, we analyse this problem under uncertain individual task completing times, specifically, we will assume that a given range, for the admissible values of each individual completing time, is available. Taking into account that the precedence relations between tasks must be preserved, each realization of the admissible execution times for the set of tasks will define a new scenario determining the ending time for the project and the subset of critical tasks.The minmax regret criterion will be used in order to obtain a robust approximation to the critical set of tasks determining the overall execution time for the project.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 197, Issue 1, 16 August 2009, Pages 235–242
نویسندگان
,