کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
4922076 | 1429656 | 2017 | 12 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Identifying and contextualising the motivations for BIM implementation in construction projects: An empirical study in China
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه
سایر رشته های مهندسی
مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
چکیده انگلیسی
Grounded in institutional theory and the innovation diffusion literature, this paper identifies the motivations of designers and general contractors to implement BIM in construction projects, and investigates how different motivations are impacted by organisational BIM capability and other contextual factors. Results of factor analysis with survey data collected from China provide support for the theoretically developed motivation model which classifies BIM implementation motivations into four categories: image motives, reactive motives, project-based economic motives, cross-project economic motives. Hierarchical regression results suggest that although project participants will have stronger economic motivations to improve project performances as their BIM capability matures, this increase in economic motivations does not necessarily require a parallel decrease of desires to improve social image. Regression results also suggest that BIM implementation motivations relate to organisational ownership type and project characteristics. The findings contribute to a broadened understanding of the multi-dimensionality and dynamics of construction organisations' innovation implementation motivations.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Project Management - Volume 35, Issue 4, May 2017, Pages 658-669
Journal: International Journal of Project Management - Volume 35, Issue 4, May 2017, Pages 658-669
نویسندگان
Dongping Cao, Heng Li, Guangbin Wang, Ting Huang,