کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5027579 1470644 2017 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Application of Critical Chain Management in Construction Projects Schedules in a Multi-Project Environment: A Case Study
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی (عمومی)
پیش نمایش صفحه اول مقاله
Application of Critical Chain Management in Construction Projects Schedules in a Multi-Project Environment: A Case Study
چکیده انگلیسی

The aim of this paper is to present the results of a comparative analysis of the application of the critical chain project management and traditional scheduling established according to the critical path method for the programme of the construction of several marinas in north-western Poland. Obtained results are of a significant importance as their possible application by building contractors or investors. Besides, they might be useful for further research connected with the effective management of a set of projects.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Procedia Engineering - Volume 182, 2017, Pages 33-41
نویسندگان
,