Stress Mitigation and Execution of Civil and Mechanical Works to Achieve the Definitive Alignment of Adduction Pipes of Ayurá WTP, Part of the Water Distribution System of Aburrá Valley
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی (عمومی)
پیش نمایش صفحه اول مقاله
Stress Mitigation and Execution of Civil and Mechanical Works to Achieve the Definitive Alignment of Adduction Pipes of Ayurá WTP, Part of the Water Distribution System of Aburrá Valley
چکیده انگلیسی
In accordance with the geological and geotechnical studies developed in 2011, was necessary mitigate the stress exerted on the pipe and to advance in works in order to protect pipes against the risk of new earthworks, earthquakes or other phenomena. The scheduling of activities started in July of 2011, beginning with the development of a drainage system to drain excess water and stabilize the soil. The alignment procedure did not require emptying pipes and was included the participation of about 100 people in each stage. This made possible the conception, adjustment and fabrication of realignment systems, brackets construction and fabrication of structures to support the machinery responsible for displace the pipes and dissipate the stress on pipes. The procedure developed did not require the service suspension due to the flexibility of the other two Water Treatment Plants: Manantiales and Villa Hermosa, which assumed the decreased flow in La Aruyá Water Treatment Plant [1], [2], [3].
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Procedia Engineering - Volume 186, 2017, Pages 44-53
نویسندگان
, , ,