کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
5030252 | 1470673 | 2016 | 6 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Optimization of the Construction Schedule for Paving a Parking Area with Concrete
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
موضوعات مرتبط
مهندسی و علوم پایه
سایر رشته های مهندسی
مهندسی (عمومی)
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
The article presents the problem of balancing work for schedules carried out in accordance with Linear Construction Methods. An example is presented of the construction of concrete surface. A number of schedules were developed for the collected data. The preeminent schedule was chosen and then optimized by curtailing working time of preceding working brigades with aid of subsequent brigades. The article presents a model which assumes that the effectiveness is equal for all brigades. Such an assumption was possible due to the nature of the activities to be performed.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Procedia Engineering - Volume 153, 2016, Pages 349-354
Journal: Procedia Engineering - Volume 153, 2016, Pages 349-354
نویسندگان
MichaÅ KrzemiÅski,