کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5080731 1477579 2013 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Two-machine flow shop scheduling of polyurethane foam production
ترجمه فارسی عنوان
برنامه ریزی دو کارخانه تولید فوم پلی یورتان
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
چکیده انگلیسی
This paper studies a two-machine flow shop scheduling problem with a supporting precedence relation. The model originates from a real production context of a chemical factory that produces foam-rubber products. We extend the traditional two-machine flow shop by dividing the operations into two categories: supporting tasks and regular jobs. In the model, several different compositions of foam rubber can be mixed at the foam blooming stage, and products are processed at the manufacturing stage. Each job (product) on the second machine cannot start until its supporting tasks (parts) on the first machine are all finished and the second machine is not occupied. The objective is to find a schedule that minimizes the total job completion time. The studied problem is strongly NP-hard. In this paper, we propose a branch-and-bound algorithm incorporating a lower bound and two dominance rules. We also design a simple heuristic and an iterated local search (ILS) algorithm to derive approximate solutions. The performances of the proposed algorithms are examined through computational experiments.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Production Economics - Volume 141, Issue 1, January 2013, Pages 286-294
نویسندگان
, , ,