کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
6748193 | 1429675 | 2015 | 12 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Achieving satisfaction when implementing PPP transportation infrastructure projects: a qualitative comparative analysis of the A15 highway DBFM project
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه
سایر رشته های مهندسی
مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
This article investigates how managers in public-private partnership (PPP) projects respond to social or physical events during the implementation of their projects, and which of their responses produce satisfactory outcomes. Multi-value Qualitative Comparative Analysis (mvQCA) was used to examine the events that took place during a large Dutch Design, Build, Finance and Maintain (DBFM) transportation infrastructure project. The analysis found that most events were social in nature. Private managers' responses to these events were internally-oriented and resulted in dissatisfactory outcomes. In contrast, externally-oriented managerial responses were associated with satisfactory outcomes. The article concludes that both public and private managers need to invest sufficiently in stakeholder management resources and capabilities when implementing projects. Although the intention of DBFM contracts is to lower the burden on the government, public managers still play an important role as intermediaries between the contractor and the local stakeholders and this role should not be underestimated.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Project Management - Volume 33, Issue 1, January 2015, Pages 189-200
Journal: International Journal of Project Management - Volume 33, Issue 1, January 2015, Pages 189-200
نویسندگان
Stefan Verweij,