کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
6846046 1436498 2017 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Experience of commissioning of the V-392M reactor plant passive heat removal system
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی هسته ای و مهندسی
پیش نمایش صفحه اول مقاله
Experience of commissioning of the V-392M reactor plant passive heat removal system
چکیده انگلیسی
During the commissioning stage of Novovoronezh NPP II's unit 1, following an update of the equipment design, the PHRS proved to be indispensible as the means to remove the reactor core heat in conditions of an unexpected scram and has confirmed its efficiency as part of an integrated test at 75% of the reactor power. The PHRS heat exchanger total heat removing capacity was over 100 MW at the ambient air temperature of -13 °C, and the time for the PHRS to reach full capacity did not exceed 90s, which corresponds to the system's design performance.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Energy and Technology - Volume 3, Issue 4, December 2017, Pages 291-296
نویسندگان
, , , ,