کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
6898676 1446114 2010 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A lower bound for weighted completion time variance
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
A lower bound for weighted completion time variance
چکیده انگلیسی
We consider a single machine scheduling problem to minimize the weighted completion time variance. This problem is known to be NP-hard. We propose a heuristic and a lower bound based on job splitting and the Viswanathkumar and Srinivasan procedure. The test on more than 2000 instances shows that this lower bound is very tight and the heuristic yields solutions very close to optimal ones since the gap between the solution given by the heuristic and the lower bound is very small.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 207, Issue 3, 16 December 2010, Pages 1221-1226
نویسندگان
, ,