												Investigating Schedule Deviation in Construction Projects through Root Cause Analysis
												
											ترجمه فارسی عنوان
													بررسی انحراف برنامه در پروژه های ساختمانی از طریق تحلیل ریشه 
													
												دانلود مقاله + سفارش ترجمه
													دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
																																												کلمات کلیدی
												تأخیر ساخت ضریب تأخیر بهره وری، پیش ساخته بررسی دلیل ریشه ای،
																																							
												موضوعات مرتبط
												
													مهندسی و علوم پایه
													مهندسی کامپیوتر
													علوم کامپیوتر (عمومی)
												
											چکیده انگلیسی
												In construction projects delays are not only disruptive but also expensive. Thus, the reasons for schedule deviation need to be identified. The delay factors determined in previous research were predominantly studied through surveys. In these studies, the participants were stakeholders in construction projects, and the reasons for schedule deviation were identified through their point of view. In addition, delay factors are typically considered individually and are presented at the same level. In reality, owing to the complex structure of construction projects and long execution time, non-conformance in schedules occurs by a chain of events. The aim of this research is to investigate the factors causing schedule deviation in construction projects and understand the cause-effect relationships between the events leading to delays. Among various techniques developed to root cause problems, fault tree analysis (FTA) is an established tool. FTA looks deeply into the chain of events leading to a problem to identify its primary cause. FTA was applied to a modular construction project that experienced significant delays. The analysis identified multiple delay factors, and showed how they are linked from the primary causes to the ultimate event. The root of most delays was traced to the inexperience of the project stakeholders.
											ناشر
												Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Procedia Computer Science - Volume 121, 2017, Pages 732-739
											Journal: Procedia Computer Science - Volume 121, 2017, Pages 732-739
نویسندگان
												Pei-Yuan Hsu, Marco Aurisicchio, Panagiotis Angeloudis, 
											