کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
7542177 | 1489081 | 2015 | 12 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
PSO based approach for scheduling NPD projects including overlapping process
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه
سایر رشته های مهندسی
مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
چکیده انگلیسی
The efficient scheduling of the new product development (NPD) projects is important to reduce the required development time, and to offer the new product faster. Activity overlapping is commonly regarded as the most promising strategy to reduce product development times. However, overlapping must be well-planned by weighting the gain from the activity overlapping against the additional time for rework. The objective of this research was to develop a resource constrained scheduling methodology for NPD projects considering overlapping of activity couples. A particle swarm optimization based approach is used to schedule NPD projects that include overlapping process. The proposed PSO method is developed into a user friendly system so that the practitioners can utilize it. A real-life example of a product development project taken from the literature is used to show the efficiency of the software.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 85, July 2015, Pages 316-327
Journal: Computers & Industrial Engineering - Volume 85, July 2015, Pages 316-327
نویسندگان
Esra Koyuncu, Rızvan Erol,