کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
761053 1462897 2013 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Short-term optimal operation of Three-gorge and Gezhouba cascade hydropower stations in non-flood season with operation rules from data mining
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی (عمومی)
پیش نمایش صفحه اول مقاله
Short-term optimal operation of Three-gorge and Gezhouba cascade hydropower stations in non-flood season with operation rules from data mining
چکیده انگلیسی

Information hidden in the characteristics and relationship data of a cascade hydropower stations can be extracted by data-mining approaches to be operation rules and optimization support information. In this paper, with Three-gorge and Gezhouba cascade hydropower stations as an example, two operation rules are proposed due to different operation efficiency of water turbines and tight water volume and hydraulic relationship between two hydropower stations. The rules are applied to improve optimization model with more exact decision and state variables and constraints. They are also used in the population initiation step to develop better individuals with culture algorithm with differential evolution as an optimization method. In the case study, total feasible population and the best solution based on an initial population with an operation rule can be obtained with a shorter computation time than that of a pure random initiated population. Amount of electricity generation in a dispatch period with an operation rule also increases with an average increase rate of 0.025%. For a fixed water discharge process of Three-gorge hydropower station, there is a better rule to decide an operation plan of Gezhouba hydropower station in which total hydraulic head for electricity generation is optimized and distributed with inner-plant economic operation considered.

Figure optionsDownload as PowerPoint slideHighlights
► Short-term optimal operation of Three-gorge and Gezhouba hydropower stations was studied.
► Key state variable and exact constraints were proposed to improve numerical model.
► Operation rules proposed were applied in population initiation step for faster optimization.
► Culture algorithm with difference evolution was selected as optimization method.
► Model and method proposed were verified by case study with feasible operation solutions.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Conversion and Management - Volume 65, January 2013, Pages 616–627
نویسندگان
, , ,