The process of electric power generation from coalwith and without post-combustion CO2 capture system was simulated using Aspen HYSIS® flowsheet simulation. The simulated plant was used to investigate the effects of different ranks of Indonesian coals on CO2 emission and plant efficiency. Simulation results on the plant efficiency penalties are agreeable with the existing studies on coal-fired power plant with an integrated CO2 capture in Indonesia, China, Australia, US and most of Organization for Economic Co-operation and Development (OECD) countries. The results also indicated that the ideal fuel for power generation is anthracite since it results in the least CO2 emission and efficiency penalty. However, due to abundant reserves of lignite and sub-bituminous, most of Indonesian power plants are fuelled with these types of coals. Therefore, more efforts should be directed to minimize efficiency penalty by improving the CO2 capture systems either by using more efficient solvents or minimizing the energy usage in solvent regeneration or both.
► Coal-fired power plant with an integrated CO2 capture was modeled and simulated.
► The impacts of different ranks of coals on the plant performances were studied.
► Simulation results are agreeable with the existing studies from various countries.
Journal: Energy Conversion and Management - Volume 68, April 2013, Pages 235–243