کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
771814 1462872 2015 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Long-term scheduling of large cascade hydropower stations in Jinsha River, China
ترجمه فارسی عنوان
برنامه ریزی بلند مدت از ایستگاه های برق آبی بزرگ در رودخانه جینشا، چین
کلمات کلیدی
ایستگاه های برق آبی بزرگ برنامه ریزی بلند مدت، بهینه سازی کلینیک مورچه، تجزیه و تحلیل جبران خسارت
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی (عمومی)
چکیده انگلیسی


• Proposing a Gaussian group selection strategy to overcome premature convergence.
• Multi-population ant are developed to enhance the search ability.
• Proposing a circulatory solution correction to handle constraints.
• Numerical and real hydropower system simulation are used to verify its performance.
• Compensation analysis has been done to large hydropower stations in Jinsha River.

The Jinsha River is the third longest river in the world. It consists of four large hydropower stations with total installed capacity 42,960 MW lying on the upper stretches of the Yangtze River, which is the longest river in the word. Due to the great potential of large cascade hydropower stations on power generation, long-term scheduling of large cascade hydropower stations (LSLCHS) plays an important role in electrical power system. As more and more concentrations focused on the optimal operation of large cascade hydropower stations, the LSLCHS has been taken into a multi-dimensional, non-convex and non-linear optimization problem due to its complicated hydraulic connection relationships and varieties of complex constraints with considering its power generation, shipping and ecological characteristics. In order to solve this problem, a multi-population ant colony optimization for continuous domain (MACOR) is proposed in this paper. A Gaussian group selection strategy is applied to overcome premature convergence and ants with different characteristics are employed to enhance search ability, and circulatory solution correction strategy is presented to handle outflow, water level and output constraints. Furthermore, the efficiency and stability of MACOR are verified by its more desirable results in comparison to other latest works in numerical simulation, and it can be a viable alternative for solving those complicated optimal problems. With the applications in hydropower operation, LSLCHS can obtain more power generation benefit than other alternatives in dry, normal and wet year, and the compensation analysis reveals that joint operation of cascade hydropower stations can enhance the total power generation especially in wet season.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Conversion and Management - Volume 90, 15 January 2015, Pages 476–487
نویسندگان
, , , ,