کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
772620 897719 2010 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی (عمومی)
پیش نمایش صفحه اول مقاله
Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach
چکیده انگلیسی

This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Conversion and Management - Volume 51, Issue 3, March 2010, Pages 524–530
نویسندگان
, , ,