کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
806224 905276 2007 15 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A study on the development of a task complexity measure for emergency operating procedures of nuclear power plants
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی مکانیک
پیش نمایش صفحه اول مقاله
A study on the development of a task complexity measure for emergency operating procedures of nuclear power plants
چکیده انگلیسی

In this study, a measure called task complexity (TACOM) that can quantify the complexity of tasks stipulated in emergency operating procedures of nuclear power plants is developed. The TACOM measure consists of five sub-measures that can cover remarkable complexity factors: (1) amount of information to be managed by operators, (2) logical entanglement due to the logical sequence of the required actions, (3) amount of actions to be accomplished by operators, (4) amount of system knowledge in recognizing the problem space, and (5) amount of cognitive resources in establishing an appropriate decision criterion. The appropriateness of the TACOM measure is investigated by comparing task performance time data with the associated TACOM scores. As a result, it is observed that there is a significant correlation between TACOM scores and task performance time data. Therefore, it is reasonable to expect that the TACOM measure can be used as a meaningful tool to quantify the complexity of tasks.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Reliability Engineering & System Safety - Volume 92, Issue 8, August 2007, Pages 1102–1116
نویسندگان
, ,