کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
8170111 1526303 2016 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Design, fabrication and first beam tests of the C-band RF acceleration unit at SINAP
موضوعات مرتبط
مهندسی و علوم پایه فیزیک و نجوم ابزار دقیق
پیش نمایش صفحه اول مقاله
Design, fabrication and first beam tests of the C-band RF acceleration unit at SINAP
چکیده انگلیسی
C-band RF acceleration is a crucial technology for the compact Free Electron Laser (FEL) facility at the Shanghai Institute of Applied Physics (SINAP), Chinese Academy of Sciences. A project focusing on C-band RF acceleration technology was launched in 2008, based on high-gradient accelerating structures powered by klystron and pulse compressor units. The target accelerating gradient is 40 MV/m or higher. Recently one prototype of C-band RF unit, consisting of a 1.8 m accelerating structure and a klystron with a TE0115 mode pulse compressor, has been tested with high-power and electron beam. Stable operation at 40 MV/m was demonstrated and, 50 MV/m approached by the end of the test. This paper introduces the C-band R&D program at SINAP and presents the experiment results of high-power and beam tests.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment - Volume 823, 1 July 2016, Pages 91-97
نویسندگان
, , , , , , , , , , ,