کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
8172391 1526330 2015 5 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Upgrade to the Birmingham Irradiation Facility
ترجمه فارسی عنوان
ارتقاء به تسهیلات تابش بیرمنگام
موضوعات مرتبط
مهندسی و علوم پایه فیزیک و نجوم ابزار دقیق
چکیده انگلیسی
The Birmingham Irradiation Facility was developed in 2013 at the University of Birmingham using the Medical Physics MC40 cyclotron. It can achieve High Luminosity LHC (HL-LHC) fluences of 1015 (1 MeV neutron equivalent (neq)) cm−2 in 80 s with proton beam currents of 1 μA and so can evaluate effectively the performance and durability of detector technologies and new components to be used for the HL-LHC. Irradiations of silicon sensors and passive materials can be carried out in a temperature controlled cold box which moves continuously through the homogenous beamspot. This movement is provided by a pre-configured XY-axis Cartesian robot scanning system. In 2014 the cooling system and cold box were upgraded from a recirculating glycol chiller system to a liquid nitrogen evaporative system. The new cooling system achieves a stable temperature of −50 °C in 30 min and aims to maintain sub-0 °C temperatures on the sensors during irradiations. This paper reviews the design, development, commissioning and performance of the new cooling system.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment - Volume 796, 1 October 2015, Pages 80-84
نویسندگان
, , , , , , ,