کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
8173217 1526338 2015 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
The status of the first infrared beamline at Shanghai Synchrotron Radiation Facility
موضوعات مرتبط
مهندسی و علوم پایه فیزیک و نجوم ابزار دقیق
پیش نمایش صفحه اول مقاله
The status of the first infrared beamline at Shanghai Synchrotron Radiation Facility
چکیده انگلیسی
Construction of the first infrared beamline BL01B1 at Shanghai Synchrotron Radiation Facility (SSRF) was completed at the end of 2013. The IR beamline collects both edge radiation (ER) and bending magnet radiation (BMR) from a port, providing a solid angle of 40 mrad and 20 mrad in the horizontal and vertical directions, respectively. The optical layout of the infrared beamline and the design of the extraction mirror are described in this paper. A calculation of the beam propagation has been used to optimize the parameters of the optical components. The photon flux and spatial resolution have been measured at the end-station, and the experimental results are in good agreement with the theoretical calculation.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment - Volume 788, 11 July 2015, Pages 116-121
نویسندگان
, , , , , , , ,