کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
858431 1470741 2014 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
An Overview of Budget Contingency Calculation Methods in Construction Industry
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی (عمومی)
پیش نمایش صفحه اول مقاله
An Overview of Budget Contingency Calculation Methods in Construction Industry
چکیده انگلیسی

Due to risks and uncertainties associated with construction projects, owner agencies usually add a reserve amount to the estimated project cost. This reserve amount, known as contingency, is to absorb the monetary impact of the risks/uncertainties and to prevent cost overrun. Over the past two decades, many contingency calculation methods for construction projects have been introduced by practitioners and researchers. These methods can be ranged from simply considering a percentage of the project base cost to complex mathematical methods. Each of these methods suggests an approach for calculating contingency using different assumptions. The question is which one of these methods should be applied to a certain project at a specific phase. Knowing the advantages and disadvantages of each method can help practitioners in construction industry select the best method based upon their project characteristics, budget, and time. This paper compiles almost all contingency calculations methods and divides them into three main categories of: (1) deterministic methods, (2) probabilistic methods, and (3) modern mathematical methods. Each of these categories are then divided into more subcategories and discussed in detail.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Procedia Engineering - Volume 85, 2014, Pages 52-60