کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
862655 | 1470802 | 2011 | 5 صفحه PDF | دانلود رایگان |

In order to improve the prediction precision of the model test water conservancy project and speed up the experiment, through the introduction of the multi-agent theory, this paper puts forward a new type of automatic control system model which is based on multi-agent water project. The automatic system monitoring agency comprises the league system control agent, the flow control agent, water level control agent and velocity of flow control agent. These control agents are responsible for controlling the whole water engineering model test and three other major tasks including testing and adjusting the flow, the water level, velocity and the sending process. The result indicates that (“the final result, make the system control agent of the normal operation of the water model test project”. The system has many advantages. For example, it is a fast and convenient way for communication. This automation hydropower project model test is with great practical value.
Journal: Procedia Engineering - Volume 24, 2011, Pages 390-394