کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
9550618 1372355 2005 19 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Governance of electricity transmission systems
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی (عمومی)
پیش نمایش صفحه اول مقاله
Governance of electricity transmission systems
چکیده انگلیسی
This paper examines three different governance mechanisms for electricity transmission systems. A regulated transmission company (“Transco”) solution suffers from the usual problems of regulatory slack in a natural monopoly. A not-for-profit independent system operator (“NISO”) solution solves the regulatory slack problem by being involved in the day-to-day operations; however, the NISO solution suffers from the problem that the NISO directors can become “captured” by industry, leading to inefficient outcomes. In contrast, a for-profit independent system operator (“PISO”) solves the regulatory slack problem and is not subject to political pressure from industry.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Economics - Volume 27, Issue 2, March 2005, Pages 237-255
نویسندگان
, ,