کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
9639235 1429748 2005 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Impact of soft logic on the probabilistic duration of construction projects
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Impact of soft logic on the probabilistic duration of construction projects
چکیده انگلیسی
Current probabilistic scheduling models are based on a single network and assume the sequences (or links or logic) between activities to be fixed. However, some links may be changeable or soft. The presence of a soft link from one activity to another indicates that the execution of these activities has several alternative sequences. This study simulates the duration of an example project by considering uncertain activity durations and probabilistic soft links. The simulated results are compared with those obtained by the program evaluation and review technique (PERT) and three other simulation-based models. The comparisons reveal that the results generated by a simulation are close to those of PERT when the simulation incorporates soft logic. Practical lessons learned by activating soft logic also are discussed.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Project Management - Volume 23, Issue 8, November 2005, Pages 600-610
نویسندگان
,