کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
9639247 1429749 2005 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding
چکیده انگلیسی
In this paper, we schedule construction projects that are repetitively performed by similar resources (labor and equipment) from one location to another when the supply of resources and funding is not only limited but also subject to uncertainty. The supply conditions are hence expressed as probabilistic distributions in lieu of single estimates. The problem is formulated as a chance-constrained program, which is converted to a deterministic equivalent and solved by means of common linear programming techniques. The proposed chance-constrained programming model is applied to a housing project with 100 units and a real-life tunnel project to illustrate its practical usefulness in determining project acceleration strategies and in conducting risk management analyses. Model verification is performed by Monte Carlo simulations to confirm that the probability of constraint satisfaction is beyond the required confidence level.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Project Management - Volume 23, Issue 7, October 2005, Pages 546-553
نویسندگان
, ,